Field notes · 2026
Field Notes
Short observations on how systems fail, and what the repair actually cost, collected between engagements.
Scheduling is a capacity problem, not a vehicle problem
Peak throughput is decided by dispatch, not by fleet size. The useful unit of analysis is the corridor, not the individual route.
Roof area is the binding constraint
For mid-sized operators, available roof area now limits adoption more than panel price does.